In 2017, on behalf of the Playing Field Committee, a bid was written by the Parish Council to the People’s Postcode Lottery for Adult Outdoor Keep-Fit Equipment. The bid was successful and by the Summer this equipment should be installed to the right of the tarmac path between the Playground and the Village Hall, starting opposite the MUGA . Look out for an announcement of a Grand Opening!

Another bid has been submitted to Torridge DC for replacement equipment for the main children’s play area. A significant, initial sum has been secured (with a sizeable contribution from the Parish Council) and the bid for more funding is in the process of being considered.